Our website uses cookies

Cookies help us to understand how you use our website so that we can provide you with the best experience when you are on our site. To find out more, read our privacy policy and cookie policy.

Manage Cookies

A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.

  1. Strictly necessary cookies(always on):
    Necessary for enabling core functionality. The website cannot function properly without these cookies. This cannot be turned off. e.g. Sign in, Language

  2. Analytics cookies:
    Analytical cookies help us to analyse user behaviour, mainly to see if the users are able to find and act on things that they are looking for. They allow us to recognise and count the number of visitors and to see how visitors move around our website when they are using it. Tools used: Google Analytics

  3. Social media cookies:
    We use social media cookies from Facebook, Twitter and Google to run Widgets, Embed Videos, Posts, Comments and to fetch profile information.

Skip To

  • Skip to Contents
  • Jump to Navigation
  • Search

IE10 and below are not supported.

Google Chrome Mozilla Firefox

Contact us for any help on browser support

Your Say North Sydney
  • Yoursay home
  • All Consultations
  • NSC website
  • Current Consultations
    • Draft Amendment to NSDCP 2013 - Ward Street Precinct Masterplan
    • The Kirribilli Centre Joint Strategic Plan 2021-2025
    • Crows Nest Centre Joint Strategic Plan 2021-2025
    • Crows Nest Over Station Development VPA
    • Planning Proposal 6/19 - 27-57 Falcon Street, North Sydney & Draft Amendment to North Sydney Development Control Plan 2013
    • Morton Street at Hazelbank Road - Pedestrian Crossing, Refuge Islands and Kerb Build Outs
    • Union Street, McMahons Point - Alternate Options to Speed Cushions
    • Young Street Plaza Trial
    • Plans of Management for Crown Land
    • Miller Street Pop-up
    • North Sydney Start-ups Mapping
    • Precinct System Review
    • 2021 Liveability Census
    • Free 15min Parking Trial - Parrawen Street
    • Redundant No Stopping and No Parking Zones
  • Sign In
Your Say North Sydney
  • Yoursay home
  • All Consultations
  • NSC website
  • Current Consultations
    • Draft Amendment to NSDCP 2013 - Ward Street Precinct Masterplan
    • The Kirribilli Centre Joint Strategic Plan 2021-2025
    • Crows Nest Centre Joint Strategic Plan 2021-2025
    • Crows Nest Over Station Development VPA
    • Planning Proposal 6/19 - 27-57 Falcon Street, North Sydney & Draft Amendment to North Sydney Development Control Plan 2013
    • Morton Street at Hazelbank Road - Pedestrian Crossing, Refuge Islands and Kerb Build Outs
    • Union Street, McMahons Point - Alternate Options to Speed Cushions
    • Young Street Plaza Trial
    • Plans of Management for Crown Land
    • Miller Street Pop-up
    • North Sydney Start-ups Mapping
    • Precinct System Review
    • 2021 Liveability Census
    • Free 15min Parking Trial - Parrawen Street
    • Redundant No Stopping and No Parking Zones
  • Sign In

You are here:

  1. Home
  2. Military Road Corridor Planning Study - Stage 1

Document Library

Preliminary Consultation (August 2018)

  • document icon Community Engagement Strategy - Military Road Corridor Planning Study (87.4 KB) (pdf)
  • document icon Stage 1 - Engagement Outcomes Summary - October 2018 (2.01 MB) (pdf)
  • document icon CiS01_Military_Road_Corridor_Planning_Study_Stage_1_-_Engagement_Outcomes (2.38 MB) (pdf)
  • document icon Terms and Conditions - Military Road Survey (203 KB) (pdf)
  • document icon Drop in Kiosk Locations (962 KB) (jpg)
  • document icon Legal & Planning Committee Report 07 May 2018 - Preparation of Military Road Corridor Planning Study (712 KB) (pdf)

Discussion Papers (late 2019)

  • document icon Council Report 28 October 2019 - Military Road Corridor, Stage 1 Discussion Papers - Engagement Outcomes (3.2 MB) (pdf)
  • document icon Objectives and Ideas Discussion Paper - MRC (14.1 MB) (pdf)
  • document icon Analysis Discussion Paper - MRC (48.7 MB) (pdf)
  • document icon Summary Brochure (2.08 MB) (pdf)
  • document icon Council Report 22 July 2019 - Military Road Corridor Planning Study Stage 1 - Discussion Papers - Decision (522 KB) (pdf)
  • document icon Background Employment Study - HillPDA Consulting (9.36 MB) (pdf)
  • document icon Background Transport Study - Aurecon Australasia (28.3 MB) (pdf)
  • Terms and Conditions
  • Privacy Policy
  • Moderation Policy
  • Accessibility
  • Technical Support
  • Site Map
  • Cookie Policy
Powered by Engagement HQ Powered by Engagement HQ